Writing a specification for an offshore team building an Israeli product
Many Israeli companies work with teams abroad: in Eastern Europe, India and Latin America. The specification has to be in English, but translating a Hebrew document is not enough. What gets lost is not the words, but everything an Israeli knows without being told.
In short
A specification for a team abroad needs three things that an internal document can do without: a glossary that sets one translation for every business term, acceptance criteria that can be checked without asking, and an Israeli section covering what a foreign team does not know: the ID number with its check digit, VAT and invoice allocation numbers, a Sunday to Thursday work week, Hebrew right-to-left text inside an English interface, and Amendment 13 to the Privacy Protection Law. Without that section, the team builds a system that is right for another country.
Why is translation not enough?
A specification written in Hebrew for an Israeli team relies on shared context. When it says invoice, everyone knows it means a tax invoice with VAT, and that above a certain amount it needs an allocation number. When it says week, everyone knows it starts on Sunday. A team abroad does not know this, and will not ask, because it does not know there is anything to ask.
The rule: everything an Israeli team understands without being told has to be written in a specification for a team abroad.
What structure does a team abroad expect?
The standard structure of requirements documents in English follows IEEE 830 and ISO/IEC/IEEE 29148, and teams abroad know it:
| Section | What goes in it |
| Introduction: Purpose, Scope, Definitions | Purpose, scope, what is out of scope, and the glossary |
| Overall Description | The product, the users, constraints and assumptions |
| Specific Requirements | User stories with acceptance criteria, data model, integrations |
| Verification | How each requirement is verified and who signs off |
| Appendixes | Screens, sample files, the Israeli section |
What to write in each section, with a permissions table and acceptance criteria: software specification template.
Glossary: one translation per term
A common mistake is translating the same Hebrew term in several different ways across the document. A customer becomes customer, then client, then account, and the team builds three entities. The glossary fixes one translation, and the whole document uses only that.
| Hebrew | In the English document | Note |
| עוסק מורשה | Licensed VAT dealer (osek murshe) | Keep the Hebrew term as well: it will appear in the interface and in documents |
| מספר הקצאה | Invoice allocation number | A number the Tax Authority issues for an invoice |
| חשבונית מס | Tax invoice | Not just invoice |
| תעודת זהות | Israeli ID number (teudat zehut) | Nine digits including the check digit |
What goes into the Israeli section?
This is the section a team abroad needs most, and the one most often missing. What to include:
- Israeli ID number: nine digits, left-padded with zeros, with a check digit calculated by the Luhn algorithm. A wrong check rejects real customers.
- VAT and invoices: the tax invoice, an allocation number for invoices above the threshold, and the VAT rate as a parameter rather than a number in the code.
- Work week: Sunday to Thursday, Friday is a short day, Saturday is the day of rest. Holidays start in the evening.
- Hebrew in the interface: right-to-left direction, fields that mix Hebrew and English, numbers inside Hebrew text. For input fields, point the team to automatic direction detection.
- Privacy: Amendment 13 to the Privacy Protection Law, especially what counts as information of special sensitivity and who may access it.
- Currency and formats: the shekel, dates with the day before the month, addresses and seven-digit postal codes.
Two items on this list have pages of their own: allocation numbers in your system and what Amendment 13 changes in a system. Both are in English, so they can go to the team as they are.
Acceptance criteria nobody has to ask about
Every requirement gets an acceptance criterion in Given, When, Then form: given a state, when an action happens, then a result follows. Development and QA teams know this form worldwide, and it prevents the question what exactly did you mean, which in a team abroad comes up only after the code is written.
Write the acceptance criteria for the Israeli section with real test data: a valid and an invalid ID number, a Hebrew name with an English word inside it, a date that falls on a Saturday.
Before the document goes to the team, run the one-hour test on it: a developer who was not at any meeting writes down every question they need answered before they can start.
What does one requirement written for a team abroad look like?
A good requirement for a team abroad has a user story, acceptance criteria and test data, all in English and all inside the document. This is a requirement for registering a patient by ID number, as it is sent to the team:
R-12. Register a patient by Israeli ID number
User story: As a clinic receptionist, I want to register a patient by their Israeli ID number (teudat zehut), so that every patient has exactly one record.
Acceptance criteria:
- Given the receptionist enters 18, when the form is saved, then the number is stored as 000000018 and accepted, because its check digit is valid.
- Given the receptionist enters 000000019, when the form is saved, then the form shows "Invalid ID number" and no record is created.
- Given the name "דנה Smith", when the record is saved and opened again, then both words keep their order and the field is displayed right-to-left.
- Given the clinic works Sunday to Friday, when the receptionist opens the booking calendar, then no Saturday slots are offered.
Look at what the example does: it states that a short number is padded with zeros on the left, gives a valid and an invalid number the team can run in a test, and defines what happens on Saturday instead of assuming the team knows. Both numbers are artificial test numbers, not numbers of real people.
Which mistakes keep recurring in specifications for teams abroad?
Most mistakes are details that look self-evident in Israel. These are the ones that recur most:
- The VAT rate as a fixed number: Israeli VAT rose from 17% to 18% in January 2025. In a system where the rate is written in the code, a change like that means a code change and a deployment; where it is a parameter, one value is updated.
- Dates without a format: 03/04 is 3 April in Israel and March 4 in the United States. In the spec, write dates in ISO 8601 format (2026-04-03), and define separately how the date is shown to the user.
- Phone numbers: an Israeli mobile number has ten digits and starts with 05; in international format, the +972 prefix replaces the leading zero. Without that definition, the team builds validation for another country.
- Holidays as fixed dates: Jewish holidays follow the Hebrew calendar and move every year on the Gregorian calendar. The spec names a source of holiday dates as data, not a hard-coded list.
- Partial mirroring of the interface: in Hebrew the layout, arrows and Previous and Next buttons are mirrored, but logos, numbers and code snippets are not. Write this down explicitly, with a sample screenshot.
- Hebrew screenshots without a legend: every label in a screenshot gets its glossary term, so the team knows which field it belongs to.
How do you hand over the specification and keep it up to date?
Name one contact on the Israeli side with the authority to decide, and record every answer inside the document. A question answered in chat that never reaches the spec will be asked again, and sometimes answered differently.
- Decision log: a section at the end of the document with the date, the question, the answer and who decided. The team reads it before every sprint.
- Shared days: a team working Monday to Friday shares only Monday to Thursday with Israel. Sunday is a working day in Israel and a day off for the team, and Friday in Israel is a short day. Plan reviews and open questions for those days.
- Versions: every change to a requirement gets a version number and a date in the document, so the team knows which version it is building and testing against.
Frequently asked questions
How do you write a specification for an offshore team?
Following the accepted structure of requirements documents: introduction and scope with a glossary, overall description, specific requirements with acceptance criteria, and verification. For a team abroad, add a section on what is specific to Israel.
Is it enough to translate the Hebrew specification?
No. Translation carries over the words, but not what an Israeli team knows without being told: VAT and allocation numbers, the work week, the ID number, Hebrew right-to-left text, and privacy. All of that has to be written explicitly.
What is a glossary and why does it matter?
A list that sets one translation for each business term. Without it, the same term is translated in several ways and the team builds several entities instead of one.
What does an offshore team not know about Israel?
That the ID number has a check digit, that an invoice above a certain amount needs an allocation number, that the work week starts on Sunday, that the interface must support Hebrew right-to-left, and what Amendment 13 to the Privacy Protection Law requires.
In what form should acceptance criteria be written?
In Given, When, Then form, which teams know worldwide, with real test data for everything specific to Israel.
How do you specify Israeli holidays for a team abroad?
As data, not as dates in the code. Jewish holidays follow the Hebrew calendar, fall on a different Gregorian date every year and start in the evening. The spec names a source of holiday dates and defines what the system does on a holiday and on its eve.
Which working days does an Israeli company share with a team abroad?
If the team works Monday to Friday, the shared days are Monday to Thursday. Sunday is a working day in Israel and a day off for the team, and Friday in Israel is a short day. Plan reviews and open questions for those four days.
How do you check that the spec is clear enough before sending it?
With the one-hour test: a developer who was not at any meeting reads the document and writes down every question they need answered before they can start. Each such question is a gap to close in the document, not in a call.
SLAtech LTD